High Rise Replacement

High Rise Access Solutions

Clear Line have been completing high rise glass replacements and providing structural glass solutions for multiple years. We can replace curtain walling or unitised facades of any building. The glass can be manufactured to suit any type of façade within the UK or Europe and we ensure the safe removal and disposal of the existing from site.


We provide bespoke access solutions for such replacements, ranging from qualified abseilers to bespoke cradle installations. However if there is already an insitu building maintenance cradle we will have operatives undertake training in order to complete works.


It is important to us to maintain an exceptional health and safety record. In order to do this for all of these types of projects we ensure that all operatives are trained in working at heights . All BMU operators are trained on the specific piece of equipment before commencement of works.


Clear Line’s abseil teams are IRATA qualified and are able to solve challenging access issues related to glazing and cladding systems, roof works, external cleaning and painting works as well as maintenance to the entire building envelope. Our technical team can advise on the best access points and rigs required to solve most maintenance issues.


Clear Line’s equipment fleet has grown recently to include two new Minicranes, which further increases our ability to offer complex lifting solutions.

Where crane access is not possible or practical, we have brought on-board two specialist Winlet Glass Installation Robots to overcome more challenging site conditions.


Clear Line has completed many high rise glass replacements and provided structural glass solutions on many projects including replacements to the Strata building in London, Bridgewater Place in Leeds and the Hilton Hotel in Manchester.


 Return to Our Services